COMPRESSOR STATIONS

  • CS – 1 Ambarlı
  • CS – 2 Doğu Beyazıt
    • General Layouts
    • Piping & Isometrics

GAS NETWORK ANALYSIS

  • MUNICIPILATIES
    • Çorum, İzmir
  • FEASIBILITY STUDIES
    • Kayseri, Malatya,
    • Bursa, Eskişehir

Reducing & Metering Stations

  • 3 x 42 MW Türkmenbaşı P.P.
  • 3 X 42 MW Nebitdağ P.P.
    • A – Class, 75 – 25 barg
    • 438 Million Nm3 / yıl
  • 2 x 123 MW Aşgabat P.P.
    • A – Type, 75 – 25 barg
    • 900 Million Nm3 / yıl
  • 2 x 123 MW Daşavuz P.P.
    • A – Type, 75 – 25 barg
    • 900 Million Nm3 / yıl

PIPELINES / NATURAL GAS PIPELINES

  • 3 x 42 MW Türkmenbaşı P.P.
    • 5000 m, Ø 300, 75 barg
    • 438 Million Nm3 / yıl
  • 3 X 42 MW Nebitdağ P.P.
    • 4500 m, Ø 300, 75 barg
    • 438 Million Nm3 / yıl
  • 1 x 123 MW ABADAN P.P.
    • 100 m, Ø 300, 75 barg
    • 438 Million Nm3 / yıl
  • 2 x 123 MW Daşavuz P.P.
    • 150 m, Ø 300, 75 barg
    • 900 Million Nm3 / yıl